Guesswork
Most lifters don't know when they're ready to progress. Should I go up 5 lbs? 10 lbs? Was that set really 2 reps in reserve? You're flying blind.
Grain tracks your sets, suggests weight increases, analyzes your progress, and tells you exactly what you need to do next. The workout app for lifters who want to optimize—not overthink.
Each set you log feeds Grain's intelligence engine. We track your Reps in Reserve (RIR), suggest when you're ready to go heavier, time your rest periods, and learn your unique response patterns.
No jumping between screens. Your complete session is visible as a grid—see every exercise, every set, and add more on the fly. Built for how real lifters actually train.
Every barbell, dumbbell, machine, and bodyweight movement you need. Filter by muscle group, equipment, or search instantly. Add new exercises to any session without leaving your workout.
Equipment broken? Want variety? Grain shows biomechanically similar exercises with match percentages. Your progress carries over—you never lose momentum due to logistics.
Grain calculates your e1RM, tracks RIR trends, analyzes intensity distribution, and shows you exactly where you're getting stronger. No guesswork—just data you can trust.
Duration, volume, sets, and most importantly—progression. Grain tells you if you moved heavier, did more reps, or improved your efficiency. See the results in real time.
Weekly, monthly, and yearly views of your training. Recovery scoring, overload metrics, intensity distribution, and volume trends all in one place. The dashboard that actually matters.
Every lifter deserves a coach that watches every rep, remembers every session, and knows exactly what you need to do next. That's what Grain does — without the $200/month price tag.
Most lifters don't know when they're ready to progress. Should I go up 5 lbs? 10 lbs? Was that set really 2 reps in reserve? You're flying blind.
Excel spreadsheets. Notes on your phone. Scribbled on the gym notebook. Tracking takes as long as the workout itself, and you still miss patterns.
You hit a wall. You don't know why. Your program doesn't adapt. You repeat the same 8 weeks and wonder why you're not getting stronger.
Set up your account, import your current program (or start fresh), and log your first workout. Takes 2 minutes.
Log sets as you train. Grain records your data, learns your patterns, and starts building your strength profile.
Get specific recommendations on weight jumps, recovery, volume, and intensity. Progress with confidence.
Every recommendation Grain makes is grounded in peer-reviewed research. Here's the data behind the features.
Hypertrophy response by proximity to failure (% gain over 8 weeks)
Sets taken within 0–2 reps of failure produce significantly more hypertrophy than sets stopped at 3+ RIR. But going to failure every set increases fatigue disproportionately.
Grain tracks your RIR on every set and recommends the sweet spot — close enough to stimulate growth, far enough to recover.
Based on: Schoenfeld et al. (2021), Refalo et al. (2023) — meta-analyses on proximity to failureHypertrophy follows a dose–response curve: more weekly sets drive more growth up to a point. Beyond ~20 sets per muscle group, returns diminish and fatigue stacks — what coaches call "junk volume."
Grain tracks your weekly volume per muscle group and flags when you're under-training or creeping into junk territory.
Based on: Schoenfeld & Grgic (2018), Krieger (2010) — volume dose-response meta-analysesLinear progression (add 5 lbs every week) works for beginners but stalls fast. Adaptive progression adjusts based on your actual performance data — RIR trends, recovery, and volume tolerance.
Grain analyzes your recent sessions and recommends increases only when the data says you're ready. That's why the curve keeps climbing.
Based on: Zourdos et al. (2016), Helms et al. (2018) — autoregulated vs. linear periodizationBe among the first to experience science-backed progression. Join the beta — it's free.